Tender: Wastewater Delivery System to Charlottetown Pollution Control Plant

 

PUBLIC BID

Stratford Utility Corporation

Wastewater Delivery System to Charlottetown Pollution Control Plant

*Please note the following revised closing dates:

Package A – CLOSED
Package B – CLOSED
Package C – CLOSED
Package D – February 21st 11:00 am     Stratford_Bid_Package_D_Addendum_5_Specifications (1)
Package E – February 21st 11:00 am     Stratford_Bid_Package_E_Addendum_3_Specifications (1)

 


Further information can be obtained at the following:
Browser link: https://projsftp.stantec.com
Login name: TOWNOFSTRATFORD1319
Password: 5580579

 


Package A – Excavated Forcemain – Stratford

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – A Excavated Forcemain – Stratford” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Wednesday, January 23rd, 2019.  Work under this contract will include the installation of approximately 1,595 metres of excavated force main, 20 metres of bored force main, 235 metres of excavated sanitary main, 4 sanitary manholes, 1 catch basin, 1 air release chamber, 1 valve chamber, 1 flow meter chamber, valves and related appurtenances and restoration.

 

Package B – Excavated Forcemain – Charlottetown

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – B Excavated Forcemain – Charlottetown” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Thursday, January 24th, 2019.  Work under this contract will include the installation of approximately 2,025 metres of excavated force main, 1 air release chamber, 1 valve chamber, 1 flow meter chamber, valves and related appurtenances and restoration.

 

Package C – Directional Drilled Forcemain

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – C Directional Drilled Forcemain” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Friday, January 25th, 2019.  Work under this contract will include the installation of approximately 965 metres of directional drilled force main with related appurtenances and restoration.

 

Package D – Wastewater Pumping Station

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – D Wastewater Pumping Station” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Thursday, January 24th, 2019.  Work under this contract will include the construction of a wastewater pumping station of dry-well/wet-well design with triplex wastewater pumps and all related appurtenances.

 

Package E – Hillsborough Bridge Forcemain

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – E Hillsborough Bridge Forcemain” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Friday, January 25th, 2019. Work under this contract will include the installation of approximately 74 metres of excavated forcemain, 480 metres of forcemain secured to the struts of the Hillsborough Bridge complete with pipe supports, and insulation, heat trace, and all related appurtenances.

 

Each individual package shall be presented within a separate sealed envelope. Contractors may bid on all or their choice of packages.

Bid documents may be obtained in digital PDF format by emailing a request to Darrell Fisher at darrell.fisher@stantec.com.  A link will be provided for the downloadable documents.  Bidders shall be responsible for printing and providing all documents necessary for the bid submission(s).

Each bid must be accompanied by a certified cheque drawn on a Canadian Chartered Bank or Bid Bond in the amount of ten percent (10%) of the Bid Price.

The Town of Stratford does not bind itself to accept the lowest or any bid.

Printable version: Tender_Ad

Tender: Wastewater Delivery System to Charlottetown Pollution Control Plant

 

PUBLIC BID

Stratford Utility Corporation

Wastewater Delivery System to Charlottetown Pollution Control Plant

*Please note the following revised closing dates:

Package A – CLOSED
Package B – CLOSED
Package C – CLOSED
Package D – February 21st 11:00 am     Stratford_Bid_Package_D_Addendum_5_Specifications (1)
Package E – February 21st 11:00 am     Stratford_Bid_Package_E_Addendum_3_Specifications (1)

 


Further information can be obtained at the following:
Browser link: https://projsftp.stantec.com
Login name: TOWNOFSTRATFORD1319
Password: 5580579

 


Package A – Excavated Forcemain – Stratford

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – A Excavated Forcemain – Stratford” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Wednesday, January 23rd, 2019.  Work under this contract will include the installation of approximately 1,595 metres of excavated force main, 20 metres of bored force main, 235 metres of excavated sanitary main, 4 sanitary manholes, 1 catch basin, 1 air release chamber, 1 valve chamber, 1 flow meter chamber, valves and related appurtenances and restoration.

 

Package B – Excavated Forcemain – Charlottetown

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – B Excavated Forcemain – Charlottetown” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Thursday, January 24th, 2019.  Work under this contract will include the installation of approximately 2,025 metres of excavated force main, 1 air release chamber, 1 valve chamber, 1 flow meter chamber, valves and related appurtenances and restoration.

 

Package C – Directional Drilled Forcemain

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – C Directional Drilled Forcemain” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Friday, January 25th, 2019.  Work under this contract will include the installation of approximately 965 metres of directional drilled force main with related appurtenances and restoration.

 

Package D – Wastewater Pumping Station

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – D Wastewater Pumping Station” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Thursday, January 24th, 2019.  Work under this contract will include the construction of a wastewater pumping station of dry-well/wet-well design with triplex wastewater pumps and all related appurtenances.

 

Package E – Hillsborough Bridge Forcemain

Sealed envelopes marked “Stratford Utility Corporation Wastewater Delivery System to CPCP Package – E Hillsborough Bridge Forcemain” will be received by the Stratford Utility Corporation, located at Stratford Town Hall, 234 Shakespeare Drive, Stratford, PE, until 2:00 PM local time on Friday, January 25th, 2019. Work under this contract will include the installation of approximately 74 metres of excavated forcemain, 480 metres of forcemain secured to the struts of the Hillsborough Bridge complete with pipe supports, and insulation, heat trace, and all related appurtenances.

 

Each individual package shall be presented within a separate sealed envelope. Contractors may bid on all or their choice of packages.

Bid documents may be obtained in digital PDF format by emailing a request to Darrell Fisher at darrell.fisher@stantec.com.  A link will be provided for the downloadable documents.  Bidders shall be responsible for printing and providing all documents necessary for the bid submission(s).

Each bid must be accompanied by a certified cheque drawn on a Canadian Chartered Bank or Bid Bond in the amount of ten percent (10%) of the Bid Price.

The Town of Stratford does not bind itself to accept the lowest or any bid.

Printable version: Tender_Ad

Date of Construction:
Style/Design:
Architect/Builder:
Integrity: